Once the steels are in to the opposite side of the building and the ridge steel is in place, works can progress with forming the three dormer windows.
Structural works are also moving at a pace to the single storey roof over the kitchen that will be semi-vaulted, creating height to the space, but not so much that heat is lost in the void.
New opening created in the first floor external cob wall, to what will be the landing. The contractor has been extremely careful in retaining the lime render externally so as to protect the cob from the weather until the window is fabricated and ready for installation.
No comments:
Post a Comment